SOC 2 Readiness — Sequencing & Delivery
Wave map · live Linear Gantt

Bizee SOC 2 roadmap

Two lenses on the same program. Wave map — the technical triage sequenced by delivery wave with dependency tracing. Gantt — the live execution plan straight from Linear, with real milestones, due dates and status.

Show wave
Tip: click a card to expand its note and highlight prerequisites (dashed red = it needs first) and downstream work (dashed blue = it unblocks).
The Atomic question — the decision that gates the legacy stack

◆ Decide first: approve the Atomic → GCP migration (decision gate SOC-163)

In Linear this is decision gate SOC-163 feeding the migration epic SOC-174. Alpana's default for the legacy stack is live-with + compensating controls + a documented sunset date, which only holds once the cutover is confirmed.

Severity (Bizee): Critical High Medium Low
LOE: XS <0.5d · S 0.5–2d · M 2–5d · L 1–2wk
Striped card = accepted "live-with"
Live chip = matched Linear issue & status